Past Projects
Below is a collection of notable past projects.
Snoqualmie Valley Alliance ChurchTenant improvement/renovation project with 8 large systems including distribution and controls.
General Contractor: Rafn Company |
||
Kent HealthPointRemoved 55 ton RTU and replaced it with a relocated 70 ton RTU. Tenant improvement also included the addition of new VAV boxes and miscellaneous duct modifications as well as a completely new control system with integration for exhaust fans and exterior lighting. We were only allowed to work on the weekends and we still came in right on schedule.
General Contractor: Abbott Construction |
||
Oculus Virtual RealityInstall a 1.5 ton split system and refrigerant piping; install six exhaust fans and ducting; install 135 grilles, registers and diffusers; demo existing MUA unit and relocate rooftop unit.
General Contractor: Unimark Construction |
||
REI, Inc.
Design/Build multiple building TI. Rezoned spaces providing new VAV boxes and new ducting.
General Contractor: Jackson Dean Construction |
||
Marymoor Business Center (Floors 2 & 3)
Design/Build (2) Floor build out of an existing shell. Provided and installed (24) VAV boxes, with exposed spiral ducting.
General Contractor: Pattison |
||
Disney Imaging
Provided 24 VAV boxes and duct work for this high tech tenant improvement project with a split AC system for their server room.
General Contractor: HST |
||
Verizon
Remodel of two buildings including the installation of multiple VAV terminal units, fire smoke dampers and DDC controls.
General Contractor: Charter Construction |
||
NECChilled water CRAC unit were used instead of DX system to take advantage of the prevailing energy code economizer exemption. Redundancy was provided via dual pumps and four multi-stage compressors.
General Contractor: Pattison |
||